How much does it cost to fit a new kitchen in 2026?

Real 2026 UK prices for fitting a kitchen – fitter day rates, labour per unit, budget to premium supply-and-fit costs, worktops, appliances, electrics, plumbing, gas, tiling and flooring – plus what's in a fitting quote, the rules that apply and how to keep the cost down.

By The UK Business Directory teamUpdated 12 min read

The short answer

For a standard UK kitchen in 2026, fitting labour alone usually costs between £1,700 and £3,500, and up to about £3,900 in London and the South East. Checkatrade puts the average fitting cost at around £3,500 for a typical family kitchen, not including the kitchen itself.

The whole project – units, worktops, appliances, fitting, electrics, plumbing, tiling and flooring – is where the numbers really spread out. Checkatrade's 2026 breakdown runs from about £5,250 for a small, simple kitchen to over £28,000 for a large one with premium materials, with an average of around £10,550. Bespoke kitchens from specialist designers can cost far more.

Kitchen fitters usually charge £200 to £360 a day, depending on where you live and their experience, and many price by the number of units – typically £100 to £150 a unit for standard cabinets. A normal kitchen takes five to ten working days to fit, and longer if walls are moving or there's a lot of electrical and plumbing work.

This guide breaks down what goes into the price, what a fitter's quote should include, which jobs need other trades or certificates, and where you can save without regretting it. Every figure is listed in the sources at the bottom of the page.

£1,700–£3,500fitting labour, standard kitchenrest of UK, 2026
£200–£360kitchen fitter day ratemore in London
£10,550average new kitchen, all inCheckatrade 2026 breakdown
5–10 daysto fit a typical kitchenlonger with building work

Step by step: getting a new kitchen fitted

  1. Set your budget and priorities. Decide what matters most – more storage, a bigger worktop, an island, better appliances – and keep 10% to 15% aside for surprises.
  2. Measure and plan the layout. Keeping the sink, cooker and dishwasher in roughly the same places saves a lot on plumbing, gas and electrics.
  3. Choose your kitchen supplier. Big retailer, trade supplier, independent showroom or bespoke maker. Get a detailed plan and itemised price.
  4. Get fitting quotes. Ask two or three fitters to visit and quote from the same plan. Check whether the quote includes removing the old kitchen, electrics, plumbing, tiling and waste.
  5. Book the other trades. An electrician for new sockets and circuits, a Gas Safe engineer for a gas hob, and a plasterer if walls need making good.
  6. Order everything early. Check every box on delivery against the order – missing panels or wrong doors are the most common cause of delays.
  7. Plan to live without a kitchen. Set up a temporary kitchen with a microwave, kettle and fridge for one to three weeks.
  8. Sign off at the end. Check doors, drawers, worktop joints and appliances, and get the electrical and gas certificates before paying the final balance.

What fitting labour costs

Day rates

Most kitchen fitters charge by the day, or work out a fixed price from how many days they expect the job to take. In 2026:

AreaTypical kitchen fitter day rate
North of England, Scotland, Wales, Northern Ireland£160–£260
Midlands and most of southern England£200–£300
London and the South East£280–£400

Many fitters work in pairs for the heavy parts, such as tall units and worktops. Two fitters at £250 each is £500 a day – but they'll usually finish much faster than one person working alone.

Price per unit

Some fitters quote per cabinet. For standard, flat-pack or rigid units, £100 to £150 a unit is common in 2026, with extras for tall larder units, corner units, wall units with lighting and complicated end panels.

Kitchen sizeUnitsTypical fitting labour
Small6–10£1,000–£2,000
Medium10–15£1,500–£3,500
Large16+£3,000–£6,000

What a fitting quote usually includes

A kitchen fitter's quote normally covers assembling and fitting the units, fitting doors and drawers, fixing the worktops, plinths and cornices, fitting the sink and tap, and fitting integrated appliances to their housings. Ask whether it also includes:

  • Taking out and disposing of the old kitchen (skip hire is often £200 to £300 a week)
  • Moving or adding plumbing for the sink, dishwasher and washing machine
  • Electrical work (new sockets, under-cabinet lights, cooker circuit)
  • Connecting a gas hob (must be a Gas Safe registered engineer)
  • Making good walls and ceilings, plastering
  • Tiling the splashback
  • Laying the floor
  • Decorating
  • Fitting an extractor and ducting to the outside

Many fitters are joiners first and use their own team of trusted trades for the rest. Others fit only, and you arrange everything else. Either is fine, as long as you know which you're getting.

What the kitchen itself costs

The units, worktops and appliances usually make up most of the bill, and here the range is huge. These ballpark figures from Checkatrade's 2026 breakdown show how wide it is:

ItemSmall, budgetLarge, premiumTypical
Units£1,500£10,000£3,000
Worktops£100£5,000£1,000
Appliances£450£5,200£2,000
Flooring£500£2,000£750

Units and doors

Budget flat-pack units from DIY stores and online retailers are the cheapest, but take longer to assemble – which adds fitting cost. Rigid (ready-assembled) units are quicker to fit and usually stronger. Bespoke or hand-painted kitchens from a local joiner or specialist maker cost the most, but are made to fit your room exactly.

The doors are where most of the "look" comes from. Many people choose mid-range carcasses and spend more on the doors and handles.

Worktops

WorktopTypical supply cost (average kitchen)
Laminate£100–£500
Solid wood (oak, walnut)£500–£1,500
Compact laminate£800–£2,000
Quartz£1,500–£4,000
Granite£1,500–£4,500
Sintered stone or porcelain£2,000–£5,000+

Stone and quartz worktops are templated after the units are fitted and installed a week or two later by the stone company, so you'll have temporary tops for a while. Laminate and wood are fitted by the kitchen fitter on the day.

Appliances

A basic set of built-in oven, hob, extractor, fridge-freezer and dishwasher can cost under £1,500. Mid-range sets are often £2,000 to £3,500, and premium brands, steam ovens, induction hobs with built-in extraction and boiling water taps can easily take it past £6,000. Integrated (built-in) appliances usually cost more than freestanding ones, and need a fitter to install them in their housing.

The other trades your kitchen may need

A kitchen is rarely just a joinery job. Most projects need at least one or two other trades.

Electrics

Most new kitchens need more sockets, new lighting and sometimes a new cooker circuit or a new consumer unit. In England and Wales, adding a new circuit or replacing the consumer unit is notifiable building work under Part P of the Building Regulations. Use a registered electrician who can self-certify the work and give you an Electrical Installation Certificate. Expect a typical kitchen rewire of sockets and lighting to cost several hundred pounds to around £2,000, depending on how much changes. Our guide to electrician costs has typical prices.

Plumbing

Keeping the sink and appliances where they are keeps plumbing costs low. Moving the sink across the room, adding an island sink or a boiling water tap, or moving a washing machine all add time and materials. A plumber might charge £150 to £600 for a typical kitchen, more if pipes need running under floors. See our plumber costs guide for day rates.

Gas

If you have a gas hob or range cooker, it must be connected by a Gas Safe registered engineer. It's illegal for anyone else to do it. Moving a gas supply costs more than reconnecting it in the same place. Here's how to check a Gas Safe engineer before they start.

Plastering, tiling and flooring

Taking out an old kitchen often reveals damaged plaster, and new tiles or paint need a smooth wall. Plastering one or two walls can be £300 to £900. Tiling a splashback is often £40 to £60 a square metre in labour. Laying a new kitchen floor depends heavily on the material – vinyl or LVT is the cheapest; stone and large porcelain tiles cost more to lay.

Most fitters prefer the floor to go down before the units for a neat, waterproof finish, though some lay it after to save on flooring. Ask which your fitter prefers.

Building work

Knocking through to a dining room, removing a chimney breast or adding an extension turns a kitchen fit into a building project. Removing a load-bearing wall needs a structural engineer's calculations and Building Regulations approval in England and Wales (or a building warrant in Scotland), and usually a steel beam. That can add £3,000 to £10,000 or more. Our guide on how to choose a builder explains what to look for when the job grows.

Rules that apply to kitchens

You don't usually need permission to replace a kitchen like-for-like. But some parts of a kitchen project are covered by the Building Regulations:

  • Electrical work – new circuits and consumer unit changes are notifiable in England and Wales.
  • Ventilation – Part F of the Building Regulations expects kitchens to have extraction. For new or altered kitchens the usual guide is an extractor fan of at least 30 litres a second if it's a cooker hood above the hob, or 60 litres a second elsewhere in the room.
  • Gas – all gas work must be done by a Gas Safe registered engineer.
  • Structural changes – removing walls or chimney breasts needs approval.
  • Drainage – moving or adding drains, particularly in extensions, can need approval.

If you live in a listed building, even internal changes may need listed building consent from the council. In a flat, check your lease – many need the freeholder's permission for major works or new extraction through outside walls.

How long does it take?

A typical timeline for a standard kitchen:

StageTypical time
Removing the old kitchenHalf a day to 1 day
First-fix electrics and plumbing1–2 days
Plastering and drying1–3 days (if needed)
Flooring (if laid first)1 day
Fitting units and laminate or wood worktops3–5 days
Stone or quartz worktop templating and fitting1–2 weeks later
Second-fix electrics and plumbing, appliances1 day
Tiling, decorating and snagging1–3 days

So a straightforward kitchen often takes one to two weeks, and three to four weeks with stone worktops or plastering. Ask your fitter for a written schedule.

Examples: what three kitchens might cost

These are illustrative examples for 2026, outside London, to show how the total adds up. They're not quotes.

Small budget refreshMid-range family kitchenLarge premium kitchen
Units and doors£1,500£4,000£10,000
Worktops£300 (laminate)£1,000 (wood)£4,000 (quartz)
Appliances£800£2,500£6,000
Fitting labour£1,500£3,000£5,000
Electrics£300£900£2,000
Plumbing and gas£200£500£1,000
Plastering, tiling, flooring£600£1,800£3,500
Skip and waste£250£250£300
Totalabout £5,450about £13,950about £31,800

How to keep the cost down

  • Keep the layout. Leaving the sink, hob and appliances in the same places is the biggest single saving.
  • Replace doors, not the whole kitchen. If your carcasses are solid, new doors, handles and worktops can transform a kitchen for a fraction of the cost.
  • Choose rigid units. They cost a little more than flat-pack, but save a day or more in fitting time.
  • Spend on what you touch. Good hinges, drawer runners and worktops last; budget there before spending on decorative extras.
  • Buy appliances separately. Kitchen retailers often mark up appliances. Compare prices before you buy them as part of a package.
  • Do the prep yourself. Removing old wall tiles, decorating at the end and taking waste to the tip can save a day or two of labour – but check with your fitter first.
  • Avoid the busiest months. Many people want a new kitchen before Christmas; spring and late summer are often easier to book.

Choosing a kitchen fitter

Kitchen fitting isn't a regulated trade, so do your checks:

  • Look at their work. Ask for photos of recent kitchens and, ideally, a phone number for a past customer.
  • Get a written, itemised quote. It should say what's included and what's not, and the payment stages.
  • Check insurance. Public liability insurance covers damage to your home.
  • Check the other trades. Ask who does the electrics and gas, and check registration with an approved scheme and the Gas Safe Register.
  • Agree payment stages. A small deposit, then payments as work is done. Never pay the full amount upfront.
  • Pay by credit card if you can. For anything costing £100 to £30,000, Section 75 of the Consumer Credit Act 1974 can make your card provider jointly liable if things go wrong.

Watch for a fitter who wants a big cash payment before starting, won't give a written quote or puts pressure on you to decide straight away. Our guide on how to spot a rogue trader explains the warning signs.

You'll find kitchen fitters in our kitchen and bathroom fitters directory. If you're in a city there's plenty of choice – for example in London, Manchester, Birmingham, Leeds, Bristol, Glasgow, Edinburgh, Cardiff and Belfast. In counties such as Essex and Hampshire, many fitters cover a wide area. Many of the same firms fit bathrooms too – our guide to bathroom fitting costs covers what that costs.

Frequently asked questions

How much does it cost to fit a kitchen in the UK in 2026?

Labour to fit a standard kitchen usually costs £1,700 to £3,500, and up to around £3,900 in London. The whole project, including units, worktops, appliances and other trades, typically ranges from about £5,000 for a small budget kitchen to over £28,000 for a large premium one.

How much does a kitchen fitter charge per day?

Usually £200 to £360 a day in 2026. Expect around £160 to £260 in the North, Scotland, Wales and Northern Ireland, and £280 to £400 in London and the South East.

How much do fitters charge per unit?

Many charge £100 to £150 per standard unit, with more for tall units, corner units and complicated end panels. A medium kitchen of 10 to 15 units typically costs £1,500 to £3,500 to fit.

How long does it take to fit a kitchen?

A standard kitchen usually takes five to ten working days. With plastering, building work or stone worktops (which are templated after the units go in), it can take three to four weeks from start to finish.

Do I need building regulations approval for a new kitchen?

Not for a like-for-like replacement. But new electrical circuits, a new consumer unit, structural changes such as removing a wall, and some drainage work need approval or must be done by a registered installer who can self-certify. Gas work must always be done by a Gas Safe registered engineer.

Does the kitchen fitter do the electrics and plumbing?

Some do basic plumbing, and many work with an electrician and plumber they trust. Ask what's included in the quote. Notifiable electrical work should be done by a registered electrician, and gas by a Gas Safe engineer.

Should flooring go down before or after the kitchen?

Many fitters prefer flooring before the units, as it gives a neater, more waterproof finish and makes future changes easier. Others lay it after to save on material. Ask your fitter, and make sure there's room for appliances like dishwashers to slide out over the new floor.

Is it cheaper to replace kitchen doors only?

Yes, often much cheaper. If the cabinets are in good condition, new doors, handles and worktops can make a kitchen look new for a fraction of the cost of a full replacement.